Neumeyer Environmental Services, Inc. - Remediation - Materials Management - Construction Support
Environmental Services

Asbestos Management
   Inspections
   Surveys
   Abatement

Lead Compliance
   Training
   Testing
   Abatement

Chemical Management
   Heavy Metals
   Inorganics
   PCBs
   Petroleum Products
   Organics

Storage Tank Services
   Testing
   Cleaning
   Removal & Demolition
   Containment

Water Management
   Water Quality
   Wastewater Management

Radiological

Structural Demolition

Construction Support
   Construction Monitoring
   Well Monitoring
   Construction Surveys
   Sampling and Analysis
   Waste Characterization
   Regulatory Compliance
   Site-Specific Plans

Health & Safety Training




Mosites Construction Company - Duquesne Flyover Project - Duquesne, PA - 2009 - $1,200,000

Scope of Work:
The Regional Industrial Development Corporation (RIDC) constructed a roadway to convey traffic over an existing rail line to Duquesne Riverplace at the old Duquesne Works Steel Mill property. The property was approved as an ACT 2 site and is currently under phased redevelopment.

Management of on-site soils required extensive sampling and analysis, use of personal protective equipment, segregation of contaminated materials and removal and management of subsurface debris due to the historical steel-making activities.

Neumeyer Environmental evaluated and managed approximately 40,000 cubic yards of impacted soils in preparation of the more than 3,000 linear feet of road construction. We worked in close coordination with the prime contractor to develop approaches that facilitated project completion and minimized costs.

Neumeyer Environmental performed the earthwork, demolition and on-site placement of surplus materials and debris such that the majority of the materials were able to be beneficially re-used on-site. Remnants of asbestos containing materials were encountered during the excavation that required abatement during portions of the work. Neumeyer Environmental was able to minimize the schedule impacts that may have resulted from this previously-unknown development. The project required approximately 14 months to complete from sampling through final excavation.



Excavation of Asbestos Contaminated Stockpile


Roadway Excavation


Utility Installation


Dust Supression During Loadout


Hoe Ram Subsurface Structures



Home xxxxxxx About Neumeyer xxxxxxx Contact xxxxxxx Qualification Statement xxxxxxx Related Links

Neumeyer Environmental Services, Inc.
3527 Smallman Street Pittsburgh PA 15201412-621-1238Fax 412-621-2978
info@neumeyerenvironmental.com

© 2002-2009 Neumeyer Environmental, Inc.