Neumeyer Environmental Services, Inc. - Remediation - Materials Management - Construction Support
Environmental Services

Asbestos Management

Lead Compliance

Chemical Management
   Heavy Metals
   Petroleum Products

Storage Tank Services
   Removal & Demolition

Water Management
   Water Quality
   Wastewater Management


Structural Demolition

Construction Support
   Construction Monitoring
   Well Monitoring
   Construction Surveys
   Sampling and Analysis
   Waste Characterization
   Regulatory Compliance
   Site-Specific Plans

Health & Safety Training

Enercon Services, Inc. - Madame Curie's Laboratory - Flannery Building - Oakland, PA - 2002 - $825,000

Scope of Work:
Nobel laureate Marie Curie, and others, worked with radiological materials in a five-story building in Oakland that was built around 1900. As a result, the building contained radiological contaminants. The residual radiological contamination within the building was identified along with asbestos containing building materials over time and targeted for remediation.

Neumeyer Environmental' scope of work included removal of asbestos materials that had been contaminated by radium. The asbestos materials included flooring, spray-applied fireproofing, and pipe insulation. We installed new thermal insulation systems, and decontaminated building components and mechanical systems.

This historic facility remains in use as office space today.

Containment for Removal of Radiologically Contaminated Asbestos

Containment for Removal of Radiologically Contaminated Asbestos

Mobile Containment Chamber Construction

Performing Work Adjacent to Decontaminated Structure

Removing Radiological Dust from Elevator Gear

Home xxxxxxx About Neumeyer xxxxxxx Contact xxxxxxx Qualification Statement xxxxxxx Related Links

Neumeyer Environmental Services, Inc.
3527 Smallman Street Pittsburgh PA 15201412-621-1238Fax 412-621-2978

© 2002-2009 Neumeyer Environmental, Inc.