Neumeyer Environmental Services, Inc. - Remediation - Materials Management - Construction Support
Environmental Services

Asbestos Management

Lead Compliance

Chemical Management
   Heavy Metals
   Petroleum Products

Storage Tank Services
   Removal & Demolition

Water Management
   Water Quality
   Wastewater Management


Structural Demolition

Construction Support
   Construction Monitoring
   Well Monitoring
   Construction Surveys
   Sampling and Analysis
   Waste Characterization
   Regulatory Compliance
   Site-Specific Plans

Health & Safety Training

Westinghouse Corporation - DOD Reactor-Circulating Pump Facility - Cheswick, PA - 1997 - $1,200,000

Scope of Work:
A Department of Defense facility managed by Westinghouse Corporation repaired reactor-circulating pumps that were used on nuclear-powered submarines and ships. After years of operation, radiological and asbestos contaminants were present throughout the structure and subsurface soil. This 30,000 square foot building required decontamination prior to its demolition.

The project involved decontamination of the pump repair building, approximately 30,000 square feet. All interior surfaces were decontaminated on-site. After decontamination, the structure was demolished. Approximately 90% of the structural material was recycled after the decontamination process. Contaminated soil beneath the structure was removed and packaged for off-site disposal. The site was backfilled and readied for site restoration.

Recycling of the demolition debris provided significant savings to Westinghouse.

Sampling Foundation Subase

Structural Demolition of Decontaminated Building

Home xxxxxxx About Neumeyer xxxxxxx Contact xxxxxxx Qualification Statement xxxxxxx Related Links

Neumeyer Environmental Services, Inc.
3527 Smallman Street Pittsburgh PA 15201412-621-1238Fax 412-621-2978

© 2002-2009 Neumeyer Environmental, Inc.