by neumeyeradmin neumeyeradmin

Passavant Hospital
Pittsburgh, PA – 1997 – $175,000

Scope of Work:
Asbestos-containing fireproofing was present on the structural steel and floor decking in a 12,000 square foot area of the hospital. The area was scheduled for extensive renovation which required demolishing the space to the structural frame.

The space was placed under negative air pressure segregated from the adjacent occupied hospital space. The asbestos fireproofing was removed from the structural steel and floor deck system and asbestos-free fireproofing was installed as part of the renovation.

The adjoining areas of the hospital continued to operate normally throughout the project.