Freeport-McMoRan

Satralloy Facility
Steubenville, OH – 2013 -2014 – $10,000,000.00

Scope of Work:
Neumeyer Environmental Services (NES) performed site waste management, a variety of remediation, demolition, and site work activities, such as but not limited to clear and grubbing, landscaping, construction, electrical installation, etc. at the Satralloy site, a former chromium processing facility near Steubenville, Ohio. The facility was dilapidated after 40 years of abandonment and illegal use and scrapping of metal from inside the buildings.

Site Work:
Neumeyer rebuilt site access roads, laydown areas, and installed a rail spur to facilitate the mobilization and demobilization of heavy equipment that road access could not support. NES performed clearing and grubbing to provide access to work areas and install/maintain erosion and sedimentation controls.

  • Safety
    • Initially, Neumeyer performed building inspections in the two large mill buildings (one 180,000 SqFt and one at 98,000 SqFt) due to the decay of structural materials and illegal scrapping of metal building materials during the decades of abandonment. NES inspected all walkways and work areas, which were repaired or permanently barricaded.
  • Waste Management
    • Removal of Heavy Metal Containing Dust
    • NES removed all heavy metal containing dust from inside the buildings (approximately 4,000 Cubic Yards), which ranged from several inches to several feet of accumulation in different areas of the buildings. Bulk removal of dust on the floors was performed, as well as vacuuming of dust from rafters and other structural components from aerial lifts.
    • To ensure worker safety, NES implemented a strict personal protective equipment (PPE) and decontamination program. Workers performed tasks in multiple layers of protective clothing and full-face air purifying respirators. Prior to all breaks and leaving the site at the end of shifts, workers underwent personal decontamination to protect themselves and their families from exposure to heavy metals. NES also performed extensive personal and area air monitoring to ensure workers were not exposed to unsafe levels of metals, as well as implementing a medical monitoring program involving physicals and bloodwork monitoring levels of heavy metals in workers to ensure they were not exposed during the work.
  • Demolitions
    • NES demolished a number of structures on the site, including a garage, smokestack, and water treatment plant. We also performed abatement of all asbestos containing materials in these structures prior to demolition, as well as in the buildings that were cleaned and left intact.
  • Chemical Management
    • NES located, collected, sorted, and disposed of a variety of hazardous chemicals on the site, including petroleum products, mercury, and PCB containing transformers.

 

by neumeyeradmin neumeyeradmin

PennDOT Settlers’ Cabin Interchange

Balfour Beatty Infrastructure
Pittsburgh, PA – 2004-2005 – $235,000

Removal of asbestos-containing window systems, exterior view

Removal of asbestos-containing window systems, exterior view

Scope of Work:
Construction of a new highway interchange required demolition of two large commercial buildings. One was a metal framework structure covered with 60,000 square feet of asbestos panels; it had been used as a distribution warehouse for industrial rubber products. The second building had housed a sales and processing operation for a water treatment company. In addition to 4,000 square feet of asbestos containing materials (ACM) in floors, roofs, and insulation materials, the building contained 500 tons of hazardous caustics and acids that had been used for water treatment.

At the rubber products warehouse, Neumeyer Environmental coated each asbestos siding panel with encapsulant to seal in any loose asbestos fibers. The 300 pound panels were unbolted, lowered to the ground, wrapped in plastic sheeting and placed in a roll-off containers. The ACM was transported to a regulated facility for disposal. After completion of the abatement, Neumeyer Environmental demolished the building.

Removal of asbestos-containing window systems, interior view

Removal of asbestos-containing window systems, interior view

In the water treatment building, Neumeyer Environmental drained and flushed all tanks and piping and collected the chemicals in containers provided by the DOT. We shipped the chemicals to a hazardous waste processing facility. Neumeyer Environmental removed and disposed of the ACM from the structure and demolished the building.

Neumeyer Environmental recycled 800 tons of structural steel and provided 3,000 tons of crushed concrete for use as roadway base material.