by neumeyeradmin neumeyeradmin

PA Turnpike to SR19 and SR79 Connecting Ramps

DCK Worldwide, LLC (Dick Corp)
Cranberry, PA – 2003-2004 – $180,000

Scope of Work:
Neumeyer Environmental conducted an abandoned oil and gas well closure in accordance with PADEP requirements to prevent migration of contaminants into the adjacent soils, atmosphere, groundwater, local drinking water wells and surface waters. Neumeyer Environmental scope of work included constructing access to the site, installing erosion and sediment controls including a sediment pond to collect the well cleaning decant to prevent migration of sediments. We removed the product pipe and multiple well casing to a depth of 2000 feet below ground surface while injecting grout to ensure the product producing zones were adequately sealed. We placed the standpipe and restored the site to pre-existing conditions.

by neumeyeradmin neumeyeradmin

North Shore Connector

North Shore Constructors I and II
Pittsburgh, – 2005-2009 – $487,000

Scope of Work:
Neumeyer Environmental was contracted to provide environmental management and construction support services for a subway connector tunnel beneath the Allegheny River from downtown Pittsburgh to the North Shore area. Neumeyer Environmental provided remediation services for abandoned asbestos-insulated steam pipes, lead compliance and abatement activities, impacted subsoils from previous historical activities, water quality discharge management and sampling and analysis in accordance with the Pennsylvania Management of Fill policy.

This project is a multi-year, multi-contract effort that is anticipated to span over five years.