United States Steel Corporation
Dravosburg, PA – 1997 – $250,000
Scope of Work:
Asbestos-containing thermal systems insulation was present throughout the facility on piping and furnaces. Maintenance of these mechanical systems required the asbestos material to first be removed to allow facility workmen to proceed with repairs without the threat of asbestos exposure.
In order to enable this project to proceed on a phased basis, Neumeyer Environmental provided services on an as-encountered basis to remove asbestos materials. The project required multiple shifts, at times seven days per week, to meet the client’s production schedule. In all, over fifty separate phases were completed.
Maintenance workers were able to perform critical repairs according to the production-dictated maintenance schedule. This allowed uninterrupted production throughout the course of the project.