Allison Park Contractors
Pittsburgh, PA – 2008-2009 – $250,000
Scope of Work:
The Urban Redevelopment Authority has been redeveloping the previous Jones and Laughlin Steel Corporation facility for numerous years. This ACT 2 site has been redeveloped as the Pittsburgh Technology Center under a multi-phased program. The 2009 phase included excavation of surplus soils that exhibited contamination and required regulated management.
In support of the work, Neumeyer Environmental provided oversight, sampling and analysis, application for the Form U permit, and transportation and disposal of regulated residual materials. We provided support to the contractor so that much of the work could be performed by their crews. The load-out operations were conducted during night shifts to allow suitable progression of the work.
Neumeyer Environmental was able to quickly transport and dispose of the contaminated materials by utilizing truck fleets to transport the stockpiled materials efficiently during non-work hours. This approach allowed the contractor to minimize the stockpile management impacts and on-site spacial constraints.